We classify every crack before injecting it — structural cracks get epoxy, active leaks get flexible polyurethane, and both get a written scope before we start.

Not every Union Grove, WI foundation crack needs the same material or approach. A vertical settlement crack behaves differently than a stair-step block crack, and we adjust injection technique and material to match what's actually happening in the wall.
Misclassifying a crack is the most common mistake in this trade, and it's the first thing we check on every Union Grove, WI job.
Most crack injection appointments can be scheduled within a day or two of your call.
Pricing is based on crack length and injection material, quoted in writing before we drill any injection ports.
Polyurethane expands to fill voids behind an actively weeping wall; epoxy is reserved for cracks that need structural bonding.

We scope every Foundation Crack Repair job in person before quoting it, since two properties with the same symptom rarely need the same fix.
Epoxy-injected cracks regain much of their original structural strength, which matters for load-bearing foundation walls.
Polyurethane cures even in the presence of water, which makes it the right call for a crack that's actively letting water through.
Stair-step cracking in block foundation walls needs a different injection port pattern than a vertical crack in poured concrete, and we adjust technique accordingly.
Vertical cracks are usually settlement-related and often isolated; horizontal cracks can indicate hydrostatic pressure pushing on the wall and get flagged for further evaluation.
Fast turnaround matters during a real estate transaction, and we prioritize scheduling for time-sensitive pre-sale repairs.

Photos texted ahead of time help us prep for the visit and sometimes speed up scheduling.
A technician measures crack width, checks for wall bowing, and determines whether it's structural, cosmetic, or actively leaking.
You'll get a price based on crack length and material — epoxy or polyurethane — before any drilling starts.
We check the injection ports after curing to confirm the material fully filled the crack before we consider the job done.

"We were selling the house and the inspector flagged a foundation crack. They came out within two days, injected epoxy, and gave us documentation for the buyer's lender."
— Union Grove Seller
"Polyurethane injection stopped an active leak the same day they showed up — didn't expect it to be that fast."
— Union Grove Homeowner
"Had two cracks — one needed epoxy, one needed polyurethane. They matched material to each one instead of using the same thing on both."
— Union Grove Customer
"Stair-step crack in our block wall had us worried about the whole foundation. Turned out to be isolated and fixable with injection."
— Union Grove Homeowner
Active leaks get flexible polyurethane regardless of classification, since stopping water intrusion is the immediate priority.
Catching a crack early with injection usually costs less than waiting until it's actively leaking.
We make the call on-site after inspecting the crack, not before we've seen it.
Multiple cracks or hard-to-access areas can extend the timeline, which we'll flag in the written quote.
A properly injected crack is unlikely to reopen at the same spot, and our work comes with a written warranty covering exactly that.
Turnaround is usually fast enough to fit within a typical closing timeline.
We handle foundation crack injection throughout Union Grove and the surrounding Union Grove, WI service area, including the zip codes listed below.



Zip codes we serve in Union Grove, WI: 53182
Call now for a free inspection and a flat-rate quote before anything gets worse.
Call +1-866-476-1348© SGP Waterproofing. All rights reserved.